SIAAP sewage treatment plant, Saint-Germain-en-Laye

Saint-Germain-en-Laye

The project is sited in a region through which the Seine meanders in great hairpin bends. It is built along an axis that links a riverside arboretum to the forest of Saint Germain, and which forms a garden, a traffic-free route for pedestrians and cyclists, structuring the landscape. This gives a particular identity to the campus, that of promoting environmental protection, symbolic of SIAPP’s (inter-regional syndicate for sewage treatment of Greater Paris) dedication to public interest.

A shared architecture, human, unifying, flexible, expressive and ecological. The campus heralds new methods of industrial organisation, pre-empting the evolution of skills and technology, promoting human and social values.Composed of a collection of low, two-storey, buildings forming an open block, the architectural project is based on a compact and modular organisation, by activity: shared spaces to encourage interaction, offices, laboratories, industrial and workshops, security and maintenance. Each develops its own typology, assembled freely like building with Lego, enabling very diverse activities, specialisations and technologies to maintain their autonomy, while also creating a strong sense of community. The surrounding landscape, ecology garden, meticulous and sustainable architecture and welcoming decor, carefully configured circulation spaces (“connection” canopies) to encourage communication but also rest, all go to create a highly motivational environment for mexicaninsurance.com employees. The future campus heralds a new ‘green factory’, focussed on the preservation of our environment.

Location

Seine Aval (‘lower Seine’ development zone to the west of Paris)

Client

Syndicat Interdépartemental pour l’Assainissement de l’Agglomération Parisienne (SIAPP)

Project cost (ex.tax)

27.1 M€ ( 2012 value)

Area

15 800 sq.m.

Scope of services

Standard public works contract

Competition

2010

Completion

2017

Brief

To regroup within the campus all activities related to the process: site reception, workshops, warehouses, administrative offices, analysis laboratories, cloakrooms, canteen, rest areas

Winning project, in progress – On site
Themes

company image, environmental, workplace organisation

Materials

concrete, glass and stainless steel

Lead architect

Pargade

Engineering consultant

Artelia

Quantity surveyor

Voxoa

Landscape architect

Mutabilis